Brian worked on plumbing in the crawl space under the house. It was much darker than this picture shows and also flooded. The contractor that was paid to re-insulate after the flood did a poor job. The good news is that we got both hot and cold water running, after two years without it. The pipes froze while the home was uninhabitable.
Will, Sam and Rich had to chisel out the old front steps. The flood waters got inside the cinder block; then froze and cracked the foundation and brick steps. Tomorrow we build forms, and then mix and pour concrete.
Will and Sam went back to Bethel Church to complete the framing of two exterior walls.